Programme HighlightsYuen Long Station Property Development YLTL No.510 involved a series of residential developments. Sanfield and MTR, the co-developers, attempted to extend the transportation network by linking up the old town to the newly developed area in Yuen Long. A passenger bridge and a vehicular bridge were designed to connect “Yoho Hub” to the existing Yuen Long MTR station.
To alleviate potential disruptions to daily operation of Light Rail, West Rail and public transport adjacent to the site, “Rotational Bridge Launching Method” was adopted. The biggest challenge was to complete a rapid and safe erection in an extremely congested construction site and not once, but twice for the two permanent bridges respectively. In which, rotation and lowering of the 2 bridges were carefully operating on top of high voltage (750V DC) overhead cables, without inducing any impact on the operation of light rails, transit trails and access to Yuen Long MTR station.
Speaker(s):
David Yip - Deputy Engineering Manager of Sanfield Building Contractors Limited
Registration & Enquiries
This webinar is free of charge and the number of participants is limited to 100. The applications will be accepted on a first-come first-served basis. For registration, please visit the YMC webpage https://forms.gle/gW87ymj7jZfx8pZdA. Successful applicants will be noticed individually. For enquiries, please contact Mr. Benny Cheung by e-mail: hkiegpgymc@gmail.com